ADDENDUM NO. 2 RFP: HVAC – NE LIBRARY


DUE DATE: 3:00 P.M. Prevailing Time,

January 27, 2017


NOTICE


This addendum must be signed, attached to, and returned with your proposal to the City of Reading by the time and date indicated ABOVE:


Q1: Do you expect this project to be under $100k or closer to $100 to $500k? A1: The total project will be over $100,000.00.

Q2: What is the floor area of the library in square footage, approximately? A2: The square footage of the library is 8,500 square feet.

Q3: Is this one contract, such that we will need to hire a structural engineer and architect under us, or will you hire them separate?


A3: This will be an all in one contract.


Q4: Will existing HVAC, electrical and structural drawings be available to the successful bidder? Either in hard copy form or electronic PDF is fine. If there are any renovations since originally constructed, will those be available also?


A4: The successful bidder will have access to the prints of building and its systems. Q5: What is the time frame for completion of the construction?

A5: As quickly as possible.


I, HEREBY CERTIFY THAT THE CHANGES COVERED BY THIS ADDENDUM HAVE BEEN TAKEN INTO ACCOUNT.


Firm Name (Type or Print) _________________________________________________________


Authorized Signature _____________________________________________________________


Title __________________________________________________________________________


Name (Type or Print) _____________________________________________________________


Date ___________________________________________________________________________