Q1. Is there an estimated value associated with this project?

A1. No estimate was sought on this project.

 

Q2. Who is the current Contractor?

A2. Advance Disposal.

 

Q3. What is the current rate per ton?

A3. $69.17/ton

 

Q4. Are there any historical tons per load available?

A4. The current cans average 14 to 16 tons per can with a production rate of 4 to 6 cans a day and 2 to 3 cans on Saturday and Sunday. The facility is currently undergoing an upgrade which may result in an increase or decrease in biosolids production, it is unknown when this will be completed or the future production level.

 

Q5. What is the engineer's estimate?

A5. No estimate on engineering cost has been done for this project.

 

Q6. What is the substantial completion time for this project?

A6. This is a 2 year contract. 2019-2020.

 

Q7. Can dump trailers be utilized instead of 30cy roll-offs?

A7. Current set up would not allow dump trailers to be utilized.

 

 

I, HEREBY CERTIFY THAT THE CHANGES COVERED BY THIS ADDENDUM HAVE BEEN TAKEN INTO ACCOUNT.

 

Firm Name (Type or Print)_________________________________

 

Authorized Signature_____________________________________

 

Title___________________________________________________

 

Name (Type or Print)____________________________________

 

Date_________________________________________________